Essential
Architecture- London Thames
Barrier |
|
architect
|
Rendel, Palmer and Tritton |
|
location
|
Woolwich, east of London |
|
date
|
1974-82 |
|
style
|
High-Tech Modern |
|
construction
|
steel |
|
type
|
surge tide barrier |
|
|
 |
|
|
The gate in the middle of this view has
been raised to the maintenance position and a barge is in attendance.
|
|
|
 |
|
|
  |
|
|
Image copyright Doug Myers
www.britishbridges.com |
Thames Barrier
The Thames Barrier is a flood control structure on the River
Thames at Woolwich Reach in London. It is the world's second largest
movable flood barrier after the Oosterscheldekering in the Netherlands.
River Thames Flood Barrier
Built across a 523 metre wide stretch of the river, the barrier
divides the river into six navigable and four smaller non-navigable
channels between nine large concrete piers. The flood gates across the
openings are radial, i.e., half-cylindrical, and they operate by
rotating, raised by hydraulics out of a horizontal sill below the water
to form the barrier. They can rotate further to allow 'underspill' for
maintenance. All the gates are made of steel. The four large central
gates are 61 metres long, 10.5 metres high (above local ground level)
and weigh 1,500 tonnes; the outer two gates are 31.5 metres.
Additionally, four radial gates by the riverbanks can be lowered. These
gate openings, unlike the main six, are non-navigable.
London is quite vulnerable to flooding. The threat has increased
over time due to the slow but continuous rise in high water level over
the centuries (20 cm / 100 years) and the slow 'tilting' of Britain (up
in the North and down in the South) caused by post-glacial rebound. This
general rise in potential water levels combined with the tidal
conditions of the Thames and with particularly severe weather conditions
can create serious flood conditions — surge tides. After 307 people died
in the UK in the North Sea Flood of 1953 the issue gained new
prominence. Early proposals for a flood control system were stymied by
the need for a large opening in the barrier to allow for vessels from
London Docks to pass through. When containerization came in and a new
port was opened at Tilbury, a smaller barrier became feasible with each
of the four main navigation spans being the same width as the span of
Tower Bridge.
The concept of the rotating gates was devised by Charles Draper.
The barrier was designed by Rendel, Palmer and Tritton for the GLC. The
site at Woolwich was chosen because of the relative straightness of the
banks, and because the underlying river rock was strong enough to
support the barrier. Work began at the barrier site in 1974 and
construction was largely complete by 1982. In addition to the barrier
itself the flood defences for 11 miles down river were raised and
strengthened. The barrier was officially opened on May 8, 1984. Total
construction cost was around £534 m (£1.3 billion in 2001 pounds) with
an additional £100 m for river defences. The barrier was designed to
cope with sea level rises until around 2030–2050. Based on current
estimates, it is expected to serve its full term. Since 1982 the barrier
has been raised over 90 times; further, it is raised every month for
testing. The barrier was operated by the National Rivers Authority until
April 1996 when it passed to the Environment Agency.
In 2005, a suggestion that it might become necessary to supersede
the Thames Barrier with a much more ambitious 16 km (10 mi) long barrier
across the Thames Estuary from Sheerness in Kent to Southend in Essex
was made public.
.jpg) |
|
links
|
BBC News: On The Rise, The Thames in 2100
|
|
www.essential-architecture.com
|
|